Concrete Calculator: Cubic Yards, Bags & Cost

Enter your shape and dimensions and the calculator returns cubic yards, bags, weight, and material value.

By Marko VisicBSc Physics, University of Ljubljana

1.36yd³

cubic yards (yd³) to order, 10% extra included

62 bags needed (80 lb)

1 yd³+0.36 yd³3 ft3 ft3 ft
A cubic yard is a cube three feet on each side, so 27 cubic feet.
Cubic feet
37 ft³
Cubic meters
1.04 m³
Weight (US tons)
2.66 US tons
Weight (lb)
5,317 lb
Weight (kg)
2,412 kg
Ready-mix material
$180
Shape

Rectangular slab: length × width × thickness.

Units
Bag size
yield 0.6 ft³/bag, Quikrete spec
= 3.05 m
= 3.05 m
= 10.2 cmdefault; check local rules

Order 1.36 yd³, 62 bags needed (80 lb)

4″CONCRETE SLAB, 4″GRAVEL BASECOMPACTED SUBGRADE
4″CONCRETEGRAVEL BASESUBGRADE
Section through the slab

A 10 by 10 foot slab 4 inches thick holds about 1.23 cubic yards of concrete. With the usual 10% extra, order 1.36 cubic yards, or 62 eighty-pound bags. The ready-mix material value is about $180. Switch the shape tabs and enter your own dimensions above, and the tool recomputes every figure for your project.

See our complete slab guide, how thick to pour a slab, and how to estimate a project, and what concrete costs per yard.

Concrete slab calculator: how to measure each shape

Pick the one that matches your project, take the dimensions called out in the diagram, and enter them above.

Concrete volume calculator: real projects, step by step

The calculator adds 10% for waste by default to cover spillage and uneven subgrade.

Slab: 12 × 12 ft patio at 4 inches

12 × 12 × (4 ÷ 12) = 48 ft³ = 1.78 yd³
+10% waste → order ≈ 1.96 yd³

1.96yd³

88 × 80-lb bags, material ≈ $260

The geometry is 12 × 12 × (4 ÷ 12) = 48 cubic feet, which is 1.78 cubic yards. Adding the default 10% for spillage and uneven subgrade, you would order about 1.96 cubic yards, or 88 eighty-pound bags. At the escalated ready-mix value that material costs about $260; with one producer’s $175 small-load fee on an order this size, an 80-pound bag has to cost under about $4.94 to beat it.

Round slab: 10 ft diameter pad at 4 inches

π × 5² ≈ 78.5 ft² → × (4 ÷ 12) = 26.2 ft³ = 0.97 yd³
+10% waste → order ≈ 1.07 yd³

1.07yd³

48 × 80-lb bags, material ≈ $140

A 10-foot circle covers π × 5² ≈ 78.5 square feet, and at 4 inches that is 26.2 cubic feet, or 0.97 cubic yards. With waste you would order about 1.07 cubic yards, 48 eighty-pound bags, for about $140 in material. The round pad uses about 21% less concrete than a 10 × 10 ft square slab at the same thickness.

Footing: 30 ft run, 16 inches wide, 8 inches deep

30 × (16 ÷ 12) × (8 ÷ 12) = 26.7 ft³ = 0.99 yd³
+10% waste → order ≈ 1.09 yd³

1.09yd³

49 × 80-lb bags, material ≈ $140

The volume is 30 × (16 ÷ 12) × (8 ÷ 12) = 26.7 cubic feet, or 0.99 cubic yards. Allowing 10% waste, order about 1.09 cubic yards, which is 49 eighty-pound bags or about $140 of ready-mix. Footings are where coming up short is most costly, because a cold joint in a structural element is hard to fix.

Column: four 12-inch sonotubes, 4 ft tall

π × 0.5² × 4 = 3.14 ft³ per tube,× 4 tubes = 12.6 ft³ = 0.47 yd³
+10% waste → order ≈ 0.51 yd³

0.51yd³

24 × 80-lb bags, material ≈ $70

One 12-inch tube holds π × 0.5² × 4 = 3.14 cubic feet, so four of them total 12.6 cubic feet, or 0.47 cubic yards. With waste that is about 0.51 cubic yards, 24 eighty-pound bags, for about $70. Setting all four in one batch keeps the mix consistent across the footings.

Wall: 24 ft long, 4 ft tall, 8 inches thick

24 × 4 × (8 ÷ 12) = 64 ft³ = 2.37 yd³
+10% waste → order ≈ 2.61 yd³

2.61yd³

118 × 80-lb bags, material ≈ $350

This wall contains 24 × 4 × (8 ÷ 12) = 64 cubic feet, or 2.37 cubic yards, rising to about 2.61 cubic yards with waste. That is 118 eighty-pound bags to mix by hand. Ready-mix runs about $350 in material plus one producer’s $150 small-load fee at this size, so a bag would have to cost under about $4.21 to compete. See the interactive bag-versus-ready-mix breakeven in the concrete bag calculator.

Stairs: 4 steps, 4 ft wide, 7-inch rise, 11-inch run (solid pour)

4 × (7 ÷ 12) × (11 ÷ 12) × 10 = 21.4 ft³ = 0.79 yd³
+10% waste → order ≈ 0.87 yd³

0.87yd³

40 × 80-lb bags, material ≈ $120

Using the solid-stair formula, the volume is 4 × (7 ÷ 12) × (11 ÷ 12) × 10 = 21.4 cubic feet, or 0.79 cubic yards. With the 10% order allowance you would order about 0.87 cubic yards, or 40 eighty-pound bags, for about $120. An open-riser or formed stair over a sloped slab uses less than a solid pour.

Cement calculator or concrete calculator?

People often search for a cement calculator, but cement is only the binder. What you order and pour is concrete, which is cement mixed with sand and stone. This tool sizes the finished concrete by volume, bags, and weight. For where the difference matters, see our guide on concrete vs cement.

Bag sizes compared

QUIKRETE No. 1101 is rated 4,000 psi at 28 days in every bag size. The bag size changes only the bags per cubic yard you carry and mix.

Yields from the QUIKRETE No. 1101 product spec; counts are 27 ÷ yield.
BagYield per bagBags per cubic yardCoverage at 4″
40 lb0.30 ft³900.9 sq ft
50 lb0.375 ft³721.1 sq ft
60 lb0.45 ft³601.35 sq ft
80 lb0.60 ft³451.8 sq ft
Bags per cubic yard
40 lb90
50 lb72
60 lb60
80 lb45
The 80-pound bag is the default here. All four sizes use the same 4,000 psi mix, so you can combine them in one pour as long as each batch keeps the same water ratio.

Ready-mix concrete calculator: bags or a truck?

The small-load fee decides it. Ready-mix is priced by the cubic yard, but a small order also pays a flat fee per delivery, and that fee steps down as the order grows. Bags carry no delivery fee, so the smaller the pour, the more the fee favors bagging.

012345678910This slab: 1.36 yd³$175$150no small-load fee above 4 yd³Small-load fee per order: Duininck Concrete, 2026One front-discharge mixer (Terex Advance FDC300) carries up to 10 yd³

Choose bags when…

Your bag price is under the breakeven. For a ten-by-ten-foot slab at four inches, an 80-pound bag beats ready-mix below about $5.73 once one producer’s $175 small-load fee is counted, and you mix at your own pace.

Choose ready-mix when…

Your bag price is over it. Past 4 cubic yards that producer charges no small-load fee, so a bag would have to cost under about $2.95 to match the ready-mix value, and the truck saves the mixing.

One front-discharge mixer model carries up to 10 cubic yards. Small orders pay a fee per delivery rather than per yard: Duininck Concrete charges $175 per order up to 2 cubic yards and $150 up to 4, and Des Moines’ 2026 price list charges $219 to $268 a cubic yard on loads under 4 cubic yards against $168 to $169 for larger loads. Try the concrete bag calculator for the breakeven at your volume.

Concrete yard calculator: what a cubic yard costs

$132.96

per yd³, national value

Census 2022, BLS PPI, Oct 2026

$177/yd³

delivered example

Lewisville, TX bid

$175

small-load fee

Duininck, smallest orders

The calculator's figure is material only, the national average value of ready-mix shipped by US producers. It is not a delivered quote: labor, forms, finishing, and delivery fees are separate, and a small order pays a per-delivery charge.

For a full installed estimate including labor, the concrete slab cost calculator builds the price from the Census cost structure and this same ready-mix value.

How much concrete weighs

145 lb/ft³

plain density

within 140–155

150 lb/ft³

reinforced or design mix

with steel

3,915 lb

per cubic yard

plain concrete

Weight matters most on elevated pours and on weak or disturbed soil, where the slab's own mass is part of the design. For demolition weight, broken-rubble swell, dumpster sizing, and pallet or payload planning, see the concrete weight calculator.

Tips for ordering

  1. Order a little extra

    Coming up short mid-pour means a cold joint and a second trip, both of which cost more than the small overage.

  2. Match thickness to load

    No US model code sets a patio or private-driveway thickness. It is a local and load decision, so check your permit rules. Volume rises in direct proportion to thickness.

  3. Size the gravel base separately

    Most slabs sit on compacted gravel. Use our gravel calculator to order the sub-base in the same planning session.

Concrete calculator FAQ

How much concrete do I need for a 10-by-10 slab?

A ten-by-ten-foot slab at four inches holds about 1.23 cubic yards; with the 10% margin you order about 1.36 cubic yards, or 62 eighty-pound bags. The ready-mix material value is about $180. Enter your exact dimensions for the precise figure.

How many 80-pound bags make a cubic yard?

About 45 eighty-pound bags, because each 80-pound bag yields 0.60 cubic feet and a cubic yard is 27 cubic feet. A 60-pound bag yields 0.45 cubic feet, so it takes about 60; a 40-pound bag yields 0.30 cubic feet, taking about 90.

When should I order ready-mix instead of bags?

When your bag price is above the breakeven for your pour. Small orders pay a flat fee per delivery, one producer’s $175 up to 2 cubic yards and $150 up to 4, so bags hold their edge on small pours: for a ten-by-ten-foot slab at four inches, an 80-pound bag wins below about $5.73. Past 4 cubic yards that producer charges no fee, and a bag has to cost under about $2.95 to compete.

How much does a yard of concrete cost?

The national average value of ready-mix shipped by US producers was about $132.96 per cubic yard at Oct 2026 (Census 2022, escalated by the BLS ready-mix index). That is not a delivered quote: recent municipal bids show $168 in Des Moines to $177 in Lewisville per cubic yard delivered, and small orders add a per-delivery fee, one producer’s $175.

How thick should a concrete slab be?

No US model code sets a thickness for a patio or private residential driveway. The IRC minimum for slab-on-ground floors is 3½ in; heavier vehicle loads call for more, but the figure is a local and engineering decision. Check your permit rules.

How much does concrete weigh?

Plain concrete is about 145 lb/ft³, roughly 3,915 lb per cubic yard. A reinforced or design mix runs about 150 lb/ft³. The exact figure varies with mix and moisture.

How much extra should I order for waste?

Order 4–10% over the plan volume. The calculator defaults to 10% for every shape to cover spillage and uneven subgrade, and you can edit it.

How do you calculate cubic yards of concrete?

Put every dimension in feet (inches divided by 12), multiply length by width by thickness for cubic feet, then divide by 27, since a cubic yard is 27 cubic feet. Add 10% for waste, or enter your dimensions above to skip the arithmetic.

How many cubic feet are in a yard of concrete?

A cubic yard is a cube three feet on each side, so 27 cubic feet. That holds whether the concrete comes from bags or a ready-mix truck.

How much does a cubic yard of concrete cover?

One cubic yard is 27 cubic feet, so a 4-inch slab covers 81 square feet and a 6-inch slab covers 54 square feet. The thicker the pour, the less area a yard reaches.

Sources

  1. U.S. Census Bureau. 2022 Economic Census, Selected Sectors: Industry by Products for the U.S. and States (table EC2200NAPCSINDPRD), NAICS 327320 × NAPCS 2040575000, United States, all establishments. 2022 (Economic Census; product tables released May 2025)
  2. U.S. Bureau of Labor Statistics, via FRED (Federal Reserve Bank of St. Louis). FRED series PCU327320327320, text data file. Sep 2026 value (updated Oct 15, 2026)
  3. The QUIKRETE Companies. QUIKRETE Concrete Mix No. 1101 Data Sheet, Yield. Revised October 2022
  4. Federal Highway Administration. FHWA-HRT-05-057, Appendix C – Proposed Revisions to the AASHTO Standard Specifications for Highway Bridges, Art. 3.3.6 (dead load) background. October 2006
  5. City of New York. NYC Administrative Code Title 27, Ch. 1, Subch. 9, Reference Standard RS 9-1, Minimum Unit Design Dead Loads for Structural Design Purposes. 1968 Building Code reference standard, kept in the current Administrative Code
  6. National Ready Mixed Concrete Association. CIP 8 – Discrepancies in Yield. 2016 (1979, 1991, 2000, 2016)
  7. City of Lewisville, Texas. Bid Tab 25-20-A Redi-Mix Concrete (award to Holcim–SOR, Inc., $59,230, approved by City Council Jul 7, 2025, File 25-4138). bid tab dated Dec 2, 2024
  8. City of Des Moines, Iowa (City Council). Roll Call resolution of Apr 20, 2026: Portland cement concrete annual supply, RFB J26-221 (Norwalk Ready-Mix Concrete, Inc.; Liberty ReadyMix), with bid tabulation. April 2026 (3-year contract)
  9. Duininck Concrete LLC. 2026 Customer Handbook — Small Loads & Call Backs; Split Loads; Unloading Time. file uploaded May 2026; no year printed in the document
  10. Terex Corporation (Terex Advance). Advance Charger Series FDC300 front discharge mixer — product description and Truck Stats. current product page
  11. Storey County (NV) Community Development. Slab / Slab-Gravel Inspection Checklist (cites IRC R506.1). Checklist dated May 5, 2022 (IRC edition adopted by Storey County)

These prices use the October 2026 producer price index from BLS, the most recent month FRED publishes, read live from FRED. FRED last refreshed these series on Nov 13, 2026.

The ready-mix escalation formula and the full source list are on the methodology page.